Hai Phong Portal

 Tiếng Việt


 
Clean Water Supply Model On Bach Long Vi Island
Hai Phong Water Supply Joint Stock Company has implemented the Clean Water Supply Station Model on Bach Long Vi Island to improve the infrastructure and enhance the quality of life for both military personnel and residents on the island. This model has been honored as one of 25 typical examples nationwide in studying and following the ideology, morality, and style of Former Vietnamese President Ho Chi Minh.

 

After carefully considering and selecting technological options, Hai Phong Water Supply Joint Stock Company effectively implemented the "Clean Water Supply Station Model on Bach Long Vi Island". The components were pre-built, transported, and installed on-site, facilitating construction and allowing for easy disassembly and relocation, with the advantage of being reinforced to prevent storms.

After more than two years of operation, the Bach Long Vi Water Supply Station now maintains stable operation, with a capacity of 120-150 cubic meters/day in the summer and 70-100 cubic meters/day in the winter, providing clean water that meets the Ministry of Health’s standards; fully meeting the water needs of the island’s residents at a price equivalent to rural areas in Hai Phong City.

With practical significance and a direct impact on improving the quality of life for local people, the "Clean Water Supply Station Model on Bach Long Vi Island" has been honored as one of the 25 exemplary models nationwide at the "Ho Chi Minh - Journey of Aspiration 2024" program. This recognition is not only a source of pride but also a great encouragement, inspiring the leadership, staff, and workers of Hai Phong Water Supply JSC to continue their efforts, striving to bring clean water to remote areas, mountains, islands, and contribute effectively to the socio-economic development of the city./.

 

Admin
QR Code

Hai Phong Portal

Editor-in-chief: Chief of staff Tran Huy Kien

Head office: 18 Hoang Dieu, Hong Bang district, Hai Phong City