Dinh Vu
Industrial Zone
Brief introduction to the Industrial Zone with following
details:
Investor:
|
Dinh Vu Development
Joint Venture Company
Address: 5th
floor, Harbour View Office
Tower, No 4 Tran Phu,
Hai Phong
Tel: 031.836169; Fax:
031.859130
Email: dvdjvc@dvez.com; Website: http://www.dvez.com
General Director:
|
Establishment date:
|
02 April 1997
|
Registered Capital:
|
79,930,000USD
|
Joint Venture Parties:
|
- Hai Phong Transportation
Works Company
- American International Group
(AIG) - U.S.
- Asia Infrastructure
Development Limited (AID) Thailand
|
Place of investment:
|
Dong Hai Commune, An Hai
district, Hai Phong City.
|
Total land area:
|
1,152ha
|
Duration:
|
50 years
|
1. Distance to regional economic and transportation hubs:
- 5km from Hai Phong
City's Center
- 2km from Hai Phong ports
- 12km from Cat Bi airport
- 8km from the central railways
station, railways link to the site is in the international network Hai
Phong - Ha Noi - Lao Cai - Con Minh (China)
- Adjacent to the end point of
National road No. 5 which has been upgraded to 4 carriage-way road.
2. Technical infrastructure:
- Total land area: 982ha. Phase
I: 164ha divided into 3 smaller locations, each location is planned to
serve different industries:
- Area for petrol and chemical
enterprises (petrochemical)
- Area for industrial enterprises
producing products for agriculture
- Area for general industries
(construction materials, metallurgy and metal milling...)
- A Complete internal road
network: main road 68m, distributor roads 24m.
- Communication: 1,800 telephone
lines.
- Power supply: from national
power grid with the assistance of one power generator of 1,000 KVA
- Water supply: from the water
treatment plant in the industrial zone, Capacity for the first phase:
10,000m2/ day and night
- Waste water treatment plant
40,000m2/ day and night